What should be verified before relying on a disaster recovery configuration?
- A That a failover has actually been tested end to end
- B That the documentation is complete
- C That the region supports it
- D That the cost is approved
Answer
That a failover has actually been tested end to end
An untested failover is an assumption. Regular drills are what turn a DR design into a real capability.





